Construction Contract (Building and Renovation)

Construction contract for building or renovating a house: works and drawings, price, stage payments, retention, schedule, delay damages, variations, defects.

Preview the template

construction-contract.docx

Highlighted fields are what you fill in when you use the template.

Construction Contract

This Contract is dated Date of this contract

BETWEEN

Owner / employer (name), ID / registration number Owner ID / registration number, of Owner address (the "Owner"); and

Contractor (name), registration number Contractor registration number, contractor licence number Contractor licence number, of Contractor address (the "Contractor"),

each a "Party" and together the "Parties". In clause 18, "this Agreement" means this Contract.

1. The Works

1.1 The Contractor will carry out and complete the following works at Site address (the "Site"), including all labour, materials, plant, temporary works and services needed for them (the "Works"):

Description of the works

1.2 The Works will be carried out in accordance with the following documents, which together with this Contract form the "Contract Documents": Drawings, specifications and bill of quantities (titles, numbers, dates). If the Contract Documents conflict, this Contract prevails, then the specification, then the drawings. The Contractor will notify the Owner of any discrepancy it finds, and the Owner will instruct how to resolve it.

1.3 The Contractor will carry out the Works in a proper and workmanlike manner, using new materials of the quality specified, in accordance with the Contract Documents, building regulations, applicable codes and standards, and the building permit.

2. Permits and Approvals

2.1 The building permit and planning and other approvals needed for the Works will be obtained by Building permit and approvals obtained by. The Contractor will obtain any approval relating to its own operations, give all notices required by law during the Works, and arrange the inspections required by the building authority.

2.2 The Contractor confirms that it holds every licence and registration that the law requires to carry out the Works.

3. Contract Price

3.1 The contract price for the Works is Currency Contract price (excluding taxes) (the "Contract Price"), on the basis of Price basis. The Contract Price is exclusive of VAT, GST or sales tax, which the Owner will pay in addition where applicable.

3.2 The Contract Price is adjusted only for Variations under clause 7 and as otherwise expressly stated in this Contract.

4. Payment

4.1 The Contract Price will be paid in the following stages:

Stage payments

4.2 When a stage is complete, the Contractor will submit a payment application stating the amount due and how it is calculated. Within seven (7) days the Owner will either confirm the amount or notify the Contractor in writing of the amount it considers due and the reasons for any difference. The Owner will pay the amount due within Days to pay each certified stage days after receiving the application.

4.3 The Owner may retain Retention (% of each payment)% of each payment as security for completion and remedying defects. Half of the retention will be paid on Practical Completion and the other half at the end of the Defects Liability Period, once the defects notified in it have been remedied.

4.4 If the Owner does not pay an amount due by its due date, the Contractor may, after giving seven (7) days' written notice, suspend the Works until payment is made, and the Completion Date and Contract Price will be adjusted for the effects of the suspension.

5. Site

5.1 The Owner will give the Contractor access to the Site from the commencement date. The Contractor will keep the Site secure, safe, tidy and free from waste, work only during these hours: Permitted working hours on site, and take reasonable care to avoid nuisance and damage to neighbouring property.

5.2 The Contractor is responsible for health and safety on the Site, will comply with all applicable health and safety laws and will provide its workers with the necessary protective equipment and training. At completion the Contractor will remove its plant, surplus materials and waste and leave the Site clean.

6. Time for Completion

6.1 The Contractor will start the Works on Commencement date, proceed regularly and diligently, and achieve Practical Completion by Completion date (the "Completion Date"). On request, the Contractor will provide a programme and keep the Owner informed of progress.

6.2 The Completion Date will be extended by a fair period if the Works are delayed by: (a) a Variation; (b) an act or omission of the Owner or its other contractors; (c) exceptionally adverse weather; (d) a suspension under clause 4.4; or (e) any other event beyond the Contractor's reasonable control. The Contractor must notify the Owner in writing within fourteen (14) days after it becomes aware of the delay, with details of its cause and likely effect.

6.3 If Practical Completion is not achieved by the Completion Date (as extended), the Contractor will pay the Owner delay damages of Currency Delay damages per day per day until Practical Completion, up to a total of Delay damages cap (% of contract price)% of the Contract Price. The Parties agree this amount is a genuine pre-estimate of the Owner's loss. The Owner may deduct delay damages from amounts due to the Contractor after giving written notice.

7. Variations

7.1 The Owner may instruct additions, omissions or changes to the Works ("Variations"). The Contractor will not carry out any Variation without a written instruction from the Owner. Before carrying it out, the Contractor will give a written quotation of its effect on the Contract Price and the Completion Date; once the Owner accepts it in writing, the Contract Price and Completion Date are adjusted accordingly.

7.2 Where a Variation is not priced in advance, it will be valued using the rates in the Contract Documents where they apply, otherwise at fair market rates.

8. Subcontracting

8.1 The Contractor may subcontract parts of the Works to suitably qualified and licensed subcontractors but may not subcontract the whole of the Works. The Contractor remains fully responsible for the work, safety and payment of its subcontractors and suppliers, and will keep the Site and the Owner's property free from any lien or claim by them.

9. Quality and Inspection

9.1 The Owner and its representatives may inspect the Works and materials at reasonable times. The Contractor will give the Owner at least two (2) working days' notice before covering up any work that will become hidden (such as foundations, reinforcement and buried services) so that it can be inspected.

9.2 The Contractor will remove and replace, at its own cost, any work or materials that do not comply with this Contract. Inspection or approval by the Owner does not relieve the Contractor of its responsibilities.

10. Practical Completion and Handover

10.1 When the Works are complete except for minor items that do not prevent their use, the Contractor will notify the Owner and the Parties will inspect the Works together within seven (7) days. If the Works meet this Contract, the Owner will issue a certificate of practical completion with a list of any minor outstanding items ("Practical Completion"). If not, the Owner will notify the Contractor of the work needed, and this clause applies again once it is done.

10.2 At handover the Contractor will deliver the keys, the certificates and approvals obtained for the Works, as-built drawings, operation and maintenance manuals, and the manufacturers' warranties for installed equipment. Risk in the Works passes to the Owner at Practical Completion.

11. Defects Liability

11.1 For Defects liability period (months) months after Practical Completion (the "Defects Liability Period"), the Contractor will remedy at its own cost any defect in the Works due to materials or workmanship not in accordance with this Contract, within a reasonable time after the Owner notifies it in writing, and immediately in an emergency.

11.2 If the Contractor does not remedy a defect within a reasonable time, the Owner may have it remedied by others and recover the reasonable cost from the Contractor or from the retention. The end of the Defects Liability Period does not limit the Contractor's liability for defects under the law.

12. Insurance

12.1 From the commencement date until Practical Completion, the Contractor will insure the Works, materials on Site and its plant against loss or damage for their full reinstatement value (contractor's all risks), in the joint names of the Owner and the Contractor where possible. Where the Works are to an existing building, the Owner will tell its own property insurer about the Works before they start.

12.2 The Contractor will maintain public liability insurance of at least Currency Minimum public liability insurance (per event) per event and employer's liability or workers' compensation insurance as required by law, and will provide certificates to the Owner on request.

13. Indemnity

13.1 The Contractor will indemnify the Owner against claims for death, personal injury or damage to property arising from the carrying out of the Works, except to the extent caused by the Owner's negligence.

14. Suspension and Termination

14.1 The Owner may terminate this Contract by written notice if the Contractor: (a) wholly suspends the Works without good reason; (b) fails to proceed regularly and diligently; (c) persistently fails to remedy non-compliant work; or (d) commits any other material breach, and does not remedy the default within fourteen (14) days of written notice; or if the Contractor becomes insolvent. The Owner may then complete the Works with others and recover from the Contractor the additional cost of doing so.

14.2 The Contractor may terminate this Contract by written notice if the Owner fails to pay an amount due within thirty (30) days after its due date, or prevents the Contractor from carrying out the Works for more than sixty (60) days, and does not remedy the default within fourteen (14) days of written notice; or if the Owner becomes insolvent. The Owner will then pay for work done, materials ordered for the Works and the Contractor's reasonable demobilisation costs.

15. Liability

15.1 Neither Party is liable for indirect or consequential loss, or loss of profit, arising out of this Contract, except for fraud, wilful misconduct, gross negligence, death or personal injury, and any liability that cannot be limited by law. Delay damages under clause 6.3 are the Owner's only remedy for delay, unless this Contract is terminated.

16. Ownership of Materials

16.1 Materials and goods for the Works become the property of the Owner when they are paid for or built into the Works, whichever is earlier. The Contractor will not remove them from the Site without the Owner's consent.

17. Adjudication

17.1 Either Party may at any time refer a dispute under this Contract to adjudication by an independent adjudicator, under the statutory adjudication scheme of the place of the Site where one applies, or otherwise under the rules of a recognised construction adjudication body. The adjudicator's decision is binding until the dispute is finally resolved under clause 18 or by agreement.

18. General Provisions

18.1 Notices. Notices under this Agreement must be in writing and delivered by hand, courier or email to the addresses set out above (or any other address a Party notifies in writing). A notice sent by email is received when sent, unless the sender receives an automated message that it was not delivered.

18.2 Entire agreement. This Agreement, including its schedules, is the entire agreement between the Parties on its subject matter and replaces all earlier discussions, proposals and agreements on that subject.

18.3 Amendment and waiver. Any change to this Agreement must be in writing and signed (including electronically) by all Parties. A failure or delay in exercising a right is not a waiver of it.

18.4 Severability. If any provision is held invalid or unenforceable, it is to be read down to the minimum extent necessary and the rest of this Agreement remains in force.

18.5 Assignment. No Party may assign or transfer its rights or obligations under this Agreement without the prior written consent of the other Party, which must not be unreasonably withheld.

18.6 Electronic signature and counterparts. This Agreement may be signed electronically and in counterparts, each of which is an original and all of which together form one instrument. Where the law governing this Agreement or the place of performance requires a wet-ink signature, witnessing, stamping, notarisation or registration for a document of this kind, the Parties will promptly complete those formalities at the cost stated in this Agreement or, if not stated, in equal shares.

18.7 Language. This Agreement is made in English. If it is translated, the English version prevails unless the governing law requires a version in another language to prevail.

18.8 Governing law and disputes. This Agreement is governed by the laws of Governing law (country / state). The Parties will first try in good faith to settle any dispute by negotiation for thirty (30) days after one Party notifies the other of it. If the dispute is not settled, it will be finally resolved by Dispute forum (courts or arbitration seat).

IN WITNESS WHEREOF, the Parties have signed this Contract on the dates written below.

Owner: Owner / employer (name)

Signature: ______________________________

Name: Owner signatory name

Title: Owner signatory title

Date: ______________________________

For and on behalf of the Contractor: Contractor (name)

Signature: ______________________________

Name: Contractor signatory name

Title: Contractor signatory title

Date: ______________________________

What's included

  • A starting point to adapt — have a lawyer review it
  • Customizable fields for your business details
  • DOCX template with variables you fill in
  • Ready for digital signatures and e-signing
  • Free to use — no credit card required

Clauses in this template

  1. 1. The Works
  2. 2. Permits and Approvals
  3. 3. Contract Price
  4. 4. Payment
  5. 5. Site
  6. 6. Time for Completion
  7. 7. Variations
  8. 8. Subcontracting
  9. 9. Quality and Inspection
  10. 10. Practical Completion and Handover
  11. 11. Defects Liability
  12. 12. Insurance
  13. 13. Indemnity
  14. 14. Suspension and Termination
  15. 15. Liability
  16. 16. Ownership of Materials
  17. 17. Adjudication
  18. 18. General Provisions

Before you use this template

  • For small and medium building, extension and renovation works agreed directly between an owner and a contractor. Large or complex projects normally use a standard form such as FIDIC, JCT, NEC or AIA, with an architect or engineer administering the contract.
  • Construction law often adds mandatory terms. In the UK, the Housing Grants, Construction and Regeneration Act 1996 gives the parties to most construction contracts (but not works on a home for its residential occupier) a right to stage payments, payment notices and adjudication at any time. In the US, contractors usually need a state licence, many states set required content and a cancellation right for home improvement contracts, and unpaid contractors and suppliers may file mechanics' liens. Building permits are always governed by local rules.
  • An electronic signature is valid for a construction contract (US ESIGN Act and UETA, UK Electronic Communications Act 2000 and common law, EU eIDAS Regulation Art. 25). A contract executed as a deed (for example to obtain a 12-year limitation period in England and Wales), lien filings and permit applications follow their own formal rules.

Construction Contract (Building and Renovation)

Free
Use this template

Sign up for free to customize and use this template

Ready to create your contract?

Sign up for free and start using templates in minutes.

Get Started Free